Solution area 04 · Electrical infrastructure and EV charging
Prepare your electrical infrastructure for new demands.
Solar PV, battery storage and EV charging points change a site's electricity supply. Think Voltaic assesses the existing electrical infrastructure and develops concepts for connection, distribution and the integration of new generation equipment and loads.

- 01
Understand your available capacity
Load profiles, incoming electrical supplies and existing distribution equipment show how much power is used today and where limits may arise. We structure the site assessment and required measurements to support further decisions.
- 02
Assess grid connection and internal distribution together
Additional generation or demand requires a suitable connection concept. We coordinate the technical information needed for discussions with the grid operator, while also assessing cable routes, electrical protection and distribution within the building.
- 03
Integrate EV charging into your energy concept
Charging points need to suit the vehicles, usage times and available connection capacity. We assess the expansion alongside PV, storage and load management, bringing mobility requirements and building operations into alignment.
- 04
Plan modifications to existing buildings
Technical modifications must take account of how the building is used. Cable routes, access, shutdowns and required specialist inspections are agreed with the parties involved. The detailed programme forms part of the agreed project scope.
- 05
Create a sound basis for future expansion
Records of existing infrastructure, power supply diagrams and clearly documented connection requirements support further decisions. We organise the relevant information so that operators, designers and construction teams can use it.
What does your energy supply need to deliver?
Talk to us about your site, consumption and project objectives. Together, we establish the information needed for an initial assessment and the steps that will move your project forward.